At Kellner Construction LLC, every complete gut out is centered around one goal: removing everything down to the structure so you can start fresh with a solid foundation. We are not here to offer surface-level fixes or cosmetic patches. Our focus is on stripping interiors to bare studs, identifying hidden issues, and preparing your space for a true rebuild. Every project receives careful planning and precision demolition, ensuring nothing compromised stays behind.
Complete gut outs strip interiors to bare framing, exposing hidden structural issues and giving you a clean foundation for whatever comes next. Load-bearing walls are evaluated, systems are disconnected safely, and every surface is removed methodically to avoid damage to the skeleton of your space. The result is a blank canvas ready for rebuilding, with no compromises or patched-over problems left behind.
We inspect your property, identify structural requirements, and map demolition scope for efficient execution.
Every interior surface is stripped to framing using manual and powered demolition tools.
All material is hauled to certified disposal sites, leaving clean space ready for rebuild.
Homeowners planning a complete gut out renovation need a contractor who listens, explains the process in plain terms, and follows through on every commitment. We treat your property with the same care we’d expect for our own, taking time to walk you through structural decisions, material choices, and realistic timelines before demolition begins. Clear updates keep you informed as the project moves forward, and every phase is completed to code with no shortcuts or surprises.
Strip away damaged materials and reveal sound framing ready for modern finishes.
Expose concealed mold, rot, and compromised framing before finishing work begins.
Replace outdated wiring, plumbing, and HVAC with modern code-compliant systems throughout.
Reconfigure rooms and openings to match how you actually use the space.
Install proper insulation and air sealing from studs out for comfort.
Build on a solid foundation with materials chosen for decades of reliable performance.
Complete gut outs demand careful structural assessment before removal begins. Load-bearing walls, utility shutoffs, and material disposal routes are identified upfront to avoid delays or safety risks. We strip interiors to bare studs while protecting critical framework, then coordinate inspections and rough-in prep for the rebuild phase. Done-right demolition prevents surprise damage and sets the stage for a solid, code-compliant renovation.
Every project starts with a full evaluation of structural elements, hidden systems, and renovation scope.
Every wall, floor, and ceiling is stripped and rebuilt with attention to load-bearing integrity and code.
Structural lumber and sheathing meet professional standards for long-term stability.
You receive regular explanations of progress, findings, and next steps throughout the gut out process.
It means stripping the interior down to the studs, subfloor, and structural framing. We remove drywall, fixtures, flooring, and cabinets to prepare for a complete rebuild from the ground up.
Timeline depends on square footage and complexity. Most residential gut outs take two to four weeks for demolition, plus inspection time before rebuild begins.
Yes. We pull all required demolition permits and schedule inspections with the building department. You won’t have to chase down paperwork or deal with compliance issues.
We stop work, document the findings, and bring you a plan. Mold remediation or structural repairs get handled before we proceed, so nothing gets buried behind new walls.
Not safely or comfortably. Dust, noise, and hazards make it impractical. Plan to relocate during active demolition and reframing for your health and peace of mind.
Reach out to Kellner construction LLC for a detailed plan, honest pricing, and complete interior demolition that sets the stage for your dream renovation in Palm Desert.